您好,欢迎来到亚洲制造网!请 |免费注册

产品展厅本站服务收藏该商铺

Huazheng Electric Manufacturing (Baoding) Co.
Ltd

免费会员
手机逛
Huazheng Electric Manufacturing (Baoding) Co.
Ltd
当前位置:Huazheng Electric Manufacturing (Baoding) Co., Ltd>>High Voltage Tester>>HV Test Transformer>> HZXC 10kVA HV Hipot Control Unit

HZXC 10kVA HV Hipot Control Unit

产品二维码
参  考  价:面议
具体成交价以合同协议为准
  • 产品型号:
  • 品牌:
  • 产品类别:磨床
  • 所在地:
  • 信息完整度:
  • 样本:
  • 更新时间:2026-03-21 14:24:53
  • 浏览次数:
收藏
举报

联系我时,请告知来自 亚洲制造网

Huazheng Electric Manufacturing (Baoding) Co., Ltd

其他

  • 经营模式:其他
  • 商铺产品:831条
  • 所在地区:
  • 注册时间:2026-03-20
  • 最近登录:2026-03-20
  • 联系人:Julia
  • 电    话:
产品简介

HZXC 10kVA HV Hipot Control Unit Control Box(≤10KVA) If the capacity of main control box is not more than 10KVA the panel of the main control box is as figure 1. Figure 1 Panel of main control box The operation of the insulation test with HZJ series HIPOT tester is as follow: 1) Please make grounding connection for sample...

详情介绍

Control Box(≤10KVA)

If the capacity of main control box is not more than 10KVA the panel of the main control box is as figure 1.

hipot hzxc10 control box

Figure 1 Panel of main control box

The operation of the insulation test with HZJ series HIPOT tester is as follow:

1) Please make grounding connection for sample object, HV transformer and main control box first

2) Please discharge the sample object if the sample object is a capacitive equipment.

3) Please make connection for tester and sample object according to figure 3.

4) Please make power connection for main control box.

5) Confirm the high voltage value in withstand.

6) Setting the protection value of current by the pointer on the over current protection relay panel.

7) Adjust the regulator to zero position and then press down the close button on the panel the tester with enable the high voltage output unit.

8) If the regulator is not at zero position when you press down the close button the high voltage output unit would not be enabled. There is a zero position indication lighter on the panel of the main control box.

9) Adjust the high voltage output to the withstand test value step by step. Read the high voltage value and LV current from meters at the same time.

10) Start the timer by the timer switcher on the main control box panel when the high voltage has.

11) If the current over the value set on the panel of the over current relay the tester would cut off the power supply of HV transformer immediately. It is said the test result is failure.

12) If the timer display value reach the set value the tester would have a sound alarm to inform operator that the withstand time is ok. If the tester has not start the over current protection unit before sound alarm it is said the test result is ok.

13) Open the power supply of HV transformer by press down the “open" button on the panel of the main control box when test is end.

14) Please discharge the high voltage circuit of sample equipment before remove off the cable connection of high voltage circuit.

Please do not start the test if some part of the tester had been destroyed.

Huazheng Electric factory

Huazheng company show

Huazheng Products process

上一篇: HZDP-90kV VLF High Voltage Withstan
下一篇: HZ-3000 Power Transformer Demagnetiz
同类优质产品

在线询价

X

已经是会员?点击这里 [登录] 直接获取联系方式

会员登录

X

请输入账号

请输入密码

=

请输验证码

收藏该商铺

X
该信息已收藏!
标签:
保存成功

(空格分隔,最多3个,单个标签最多10个字符)

常用:

提示

X
您的留言已提交成功!我们将在第一时间回复您~