HZAQ Insulating Tool Dielectric Complete Test Equipment
Insulating Tool Dielectric Complete Test Equipment Product Description
Insulation boots, insulating gloves, insulating rods, electroscopes, phasing stick, insulating clothes, insulated ropes and other equipment are the necessary safety protective equipment for the operation and maintenance of electric power systems. DL408 “Safety Working Procedures for Electric Power Industry"provides common safety equipment. Test methods and cycles. The test period of equipment such as the insulation rod electroscope nuclear phase meter is six months, and breakdown, flashover and overheating are not allowed during the test. Insulated boots insulated gloves are not allowed to break down during the withstand voltage test and the leakage current must not exceed the required value.
Our company's complete set of safety equipment testing equipment has a number of patents, making testing more convenient and accurate, while ensuring the personal safety of test personnel.
The complete set of test equipment for safety tools and tools is based on the HZAQ-KS insulation tool test bench, and it is transformed into a power frequency withstand voltage test system with a pressure regulator and test. Combined with the following supporting equipment to complete the relevant testing project.
HZAQ-KS Insulating Tool Dielectric Complete Test Equipment can use computer centralized control to realize automatic control of test, and establish database to automatically issue test report.