您好,欢迎来到亚洲制造网!请 |免费注册

产品展厅本站服务收藏该商铺

Huazheng Electric Manufacturing (Baoding) Co.
Ltd

免费会员
手机逛
Huazheng Electric Manufacturing (Baoding) Co.
Ltd
当前位置:Huazheng Electric Manufacturing (Baoding) Co., Ltd>>Transformer Tester>> HZ-3010H Automatic Transformer Comprehensive Tester

HZ-3010H Automatic Transformer Comprehensive Tester

产品二维码
参  考  价:面议
具体成交价以合同协议为准
  • 产品型号:
  • 品牌:
  • 产品类别:磨床
  • 所在地:
  • 信息完整度:
  • 样本:
  • 更新时间:2026-03-20 16:31:32
  • 浏览次数:
收藏
举报

联系我时,请告知来自 亚洲制造网

Huazheng Electric Manufacturing (Baoding) Co., Ltd

其他

  • 经营模式:其他
  • 商铺产品:831条
  • 所在地区:
  • 注册时间:2026-03-20
  • 最近登录:2026-03-20
  • 联系人:Julia
  • 电    话:
产品简介

HZ-3010H Automatic Transformer Comprehensive Tester The transformer comprehensive tester is a device for testing large-scale power transformers that integrates a three-channel DC resistance tester, a low-voltage short-circuit impedance tester, and an on-load switch tester. I. Product main...

详情介绍

HZ-3010H Automatic Transformer Comprehensive Tester

The transformer comprehensive tester is a device for testing large-scale power transformers that integrates a three-channel DC resistance tester, a low-voltage short-circuit impedance tester, and an on-load switch tester.

HZ-3010H Automatic Transformer Comprehensive Tester.jpg


1 DC resistance:

(1) Main technical indicators:
Three-phase test: 5A+5A and 1A+1A
Test range: 5A: 10mΩ to 4Ω
1A: 1Ω to 20Ω
Phase separation test: 10A, 5A, 1A
Test range: 10A: 500.0μΩ~1Ω
&5A: 10mΩ to 4Ω
1A: 1Ω to 20Ω
Resolution: 0.1μΩ
Measurement accuracy: 0.2


(2) Main features:
Three-phase simultaneous test and automatic magnetic assist function;
All high and low voltage current and potential test lines can be connected to the transformer at one time. It is not necessary to invert the test line during the test.
For a winding test with a neutral point star connection, three-phase simultaneous test can be used to test the resistance of A0, B0, and C0 phases, which greatly saves test time.
For the low-voltage side test of a three-phase five-column low-voltage internal angle-joint transformer, the method of automatic magnetic assist can be used, and the test speed is fast;
It can display and print all test data of high, medium and low voltage windings of transformer, and automatically calculate the unbalance degree of three phases. It can also print the resistance data converted to rated temperature.


2 short circuit impedance:

(1) Main technical indicators:
Voltage measurement range: 5----400V; Measurement accuracy: 0.2
Current measurement range: 0.1---10A; Measurement accuracy: 0.2


(2) Main features:
Single-phase 220V low-voltage power supply is used to automatically apply current to the AB, BC, and CA windings of the transformer, and the data is collected synchronously and the rated impedance percentage is converted.
Three-phase transformers with Y/△, Y/Y, and △/Y wiring methods can connect the cables once and select three-phase measurement to automatically measure the data and automatically calculate the impedance and impedance errors.
When using the single-phase method of the instrument as a three-phase transformer, input parameters should be input 1/3 of the rated capacity.


3 on-load switch Tap Charger:

(1) Main technical indicators:
Output current: 0.4A
Resistance resolution: 0.01Ω
Transition resistance range: 1Ω~30Ω
Transition time range: 0~200ms
Measurement Accuracy: Transition Resistance ± (5% + 0.2Ω) Simultaneous Time 0.1ms


(2) Main features:
Three independent constant current sources;
powerful, can realize the transition waveform, transition time, transition resistance, three parameters of the same period of measurement;
Intelligent test and result analysis;
It can display and print test waveforms of transformer on-load switch;
The instrument is equipped with an automatic discharge circuit and an overvoltage protection circuit.


Our Services

1. 24 hours hot line.
2. We supply OEM service.
3. Our engineers available to service machinery overseas.
4. We can produce the products as your request.
5. To produce high quality products, services to the public.
6. To act quickly, seize the opportunity, continuous innovation, the pursuit of excellence.

Similar Products

Transformer Tester


onsite testing

Do you want to get more information? Click "Send" now!

上一篇: HZBS-N3 Automatic Closed Cup Flash P
下一篇: HZAQ Insulating Tool Dielectric Comp
同类优质产品

在线询价

X

已经是会员?点击这里 [登录] 直接获取联系方式

会员登录

X

请输入账号

请输入密码

=

请输验证码

收藏该商铺

X
该信息已收藏!
标签:
保存成功

(空格分隔,最多3个,单个标签最多10个字符)

常用:

提示

X
您的留言已提交成功!我们将在第一时间回复您~