HZCT-100C Variable Frequency Current Voltage Transformer CT PT Test Kit
HZCT-100C variable frequency transformer tester is a new generation of current and voltage transformer testing instrument developed by our company after extensive market research and in-depth theoretical research. The device adopts a manufacturing process of high-performance DSP and ARM, ensuring stable and reliable product performance, complete functionality, high automation level, and high testing efficiency. It is a professional testing instrument used for transformers in the power industry.
Technical Parameter
|
| Transformer Tester | |
| Usage | CT & VT | |
| Output | 0~180Vrms,12Arms,18A(peak value) | |
| CT Ratio | Range | 1~40000 |
| accuracy | ±0.2% | |
| PT Ratio | Range | 1~40000 |
| accuracy | ±0.2% | |
| Phase | Range | ±5min |
| accuracy | 0.5min | |
| DC resistance | Range | 0~300Ω |
| accuracy | 2%±2mΩ | |
| Burden | Range | 0~300VA |
| accuracy | 2%±0.2VA | |
| Power supply | AC220V±10%,50/60Hz | |
| Environmental Conditions | Operating temperature :-10οC ~50οC,Humidity :≤90% | |
| Weight and Dimensions | Dimensions:340 mm×300 mm×150mm,Weight<9kg | |
Test connection
Used for selecting one or more experiment item, including four options such as resistance, excitation, ratio, burden etc. According to transformer type, four options can be combinated as shown in below table.
Table 2.1 CT experiment project description
| experiment item | Description | Connection diagram | |||
| resistance | excitation | ratio | burden | ||
| √ |
|
|
| Measure CT’s secondary winding resistance | Fig 2.1,can disconnection if measuring primary winding. |
| √ | √ |
|
| Measure CT’s secondary winding resistance and excitation characteristic | Fig 2.1,can disconnection if measuring primary winding. |
| √ |
| √ |
| Measure CT’s secondary winding resistance, check it’s ratio and polarity | Fig 2.1 |
| √ | √ | √ |
| Measure CT’s secondary winding resistance and excitation characteristic, check it’s ratio and polarity | Fig 2.1 |
|
|
|
| √ | Measure CT’s secondary burden | Fig 2.2 |
Note:the ‘√’ means valid ,and the blank means invalid
Step:
Step 1. According to the CT testing project description of the table 2.1 to wiring(For all the CT structures,please refer to the description of appendix D for the actual connection mode)
Step 2. The other windings of the same CT should be opened,CT’s primary side to grounding, equipment should be also to ground
Step 3. Power on and prepare parameters Settings.
Step 4. Then switch cursor to the “start" button to start














所有评论仅代表网友意见,与本站立场无关。