您好,欢迎来到亚洲制造网!请 |免费注册

产品展厅本站服务收藏该商铺

Huazheng Electric Manufacturing (Baoding) Co.
Ltd

免费会员
手机逛
Huazheng Electric Manufacturing (Baoding) Co.
Ltd
当前位置:Huazheng Electric Manufacturing (Baoding) Co., Ltd>>High Voltage Tester>> Sf6 Insulating Gas Type High Voltage Partial Discharge Test System For GIS

Sf6 Insulating Gas Type High Voltage Partial Discharge Test System For GIS

产品二维码
参  考  价:面议
具体成交价以合同协议为准
  • 产品型号:
  • 品牌:
  • 产品类别:磨床
  • 所在地:
  • 信息完整度:
  • 样本:
  • 更新时间:2026-03-21 11:48:27
  • 浏览次数:4
收藏
举报

联系我时,请告知来自 亚洲制造网

Huazheng Electric Manufacturing (Baoding) Co., Ltd

其他

  • 经营模式:其他
  • 商铺产品:831条
  • 所在地区:
  • 注册时间:2026-03-20
  • 最近登录:2026-03-20
  • 联系人:Julia
  • 电    话:
产品简介

Product introduction: HZGTU gas-filled non-partial discharge combined electrical test device is suitable for high-voltage, large-capacity GIS, GIL power equipment insulation withstand voltage test, partial discharge test and accuracy test of GIS transformers. It is a necessary device for GIS...

详情介绍

High Voltage Partial Discharge Test System For GIS


Product introduction:

HZGTU gas-filled non-partial discharge combined electrical test device is suitable for high-voltage, large-capacity GIS, GIL power equipment insulation withstand voltage test, partial discharge test and accuracy test of GIS transformers. It is a necessary device for GIS substations, GIS, GIL power equipment manufacturers, basin insulators, and insulation structural parts manufacturers to conduct preventive tests and factory tests.


Adding a high-voltage casing interface to the equipment can lead to high-voltage, which can perform various high-voltage tests on traditional high-voltage equipment. II.Basic performance of test equipment:

1.Technical index

Voltage level::100kV、200kV、250kV、300kV、500kV、800kV、1000kV.

Capacity:50-2000kVA

High-voltage generation methods: high-voltage transformer step-up and series resonance (power frequency, variable frequency), all step-up methods are one-stage step-up without cascade step-up.

Input voltage (primary voltage):0.35-10kV

Partial discharge of equipment: 1-3pc under rated voltage (normal environment)

Temperature rise: the temperature rise is not more than 65k (50Hz) after running at rated current for 60 minutes


2.Technical parameters of test system components

GTU high voltage non-partial discharge test transformer

The GTU high-voltage non-partial discharge test transformer is the key to the test system. It is placed in a specially designed SF6 insulating container. The high-voltage side is separated from other circuits by high-voltage disc insulators. All low-voltage terminals are placed in the junction box.

The low voltage side of the transformer is wound with excitation winding and measurement winding (measurement winding is only used for system testing). For large-capacity (500kVA and above) transformer compensation, there is an independent compensation winding to better play the test of low voltage and load. Flexibility to improve the efficiency of compensation.

The transformer tank is equipped with a gas/vacuum quick connector, a pressure monitoring gauge, an over-pressure release valve, and temperature and pressure sensors for remote monitoring of the operation console.


Voltage level  (KV)

High voltage current   (A)

Partial discharge under rated voltage(Pc)

Short circuit impedance voltage

Voltage regulator configuration  kVA

Temperature rise at rated current for 60 minutes

  250

 

0.5--5

 

 

 ≤3Pc

 

 

 

 

≤10%

 

 

 

 

50--200





≤50K(Power frequency)

  350

  400

  500

 

 0.5--4

  550

  600

  800

 

1.0--3

 

 ≤5Pc

 1000

 1200


Huazheng Electric factory

Huazheng company show

Huazheng Products process

Huazheng Onsite Testing

上一篇: Intelligent Lightning Protection Com
下一篇: GGD Type AC Low Voltage Fixed Power
同类优质产品

在线询价

X

已经是会员?点击这里 [登录] 直接获取联系方式

会员登录

X

请输入账号

请输入密码

=

请输验证码

收藏该商铺

X
该信息已收藏!
标签:
保存成功

(空格分隔,最多3个,单个标签最多10个字符)

常用:

提示

X
您的留言已提交成功!我们将在第一时间回复您~