HZBZ-IV Automatic Transformer Comprehensive Test Bench System Transformer Testing Bed




1.System Introduction
HZBZ-IV automatic transformer comprehensive test system is technically used for routing test,type test and special test of transformers, including automatic test capability for ratio-voltage,direct current resistance, no-load loss measurement,induced over voltage withstand test,temperaturerisetest(10~35kV class distribution transformer). All the test items can be operated by the relevant transformer automatic comprehensive test syste.
The fully automatic model adopts PLC as the control core and industrial control computer as the man-machine interaction interface, which has the outstanding advantages of high reliability, intuitive interface, simple operation and perfect protective measures.

2.Detailed Configuration and Technical Parameters
NO. | Equipment | Model | Quantity |
1、Test instrument | |||
01 | fully automatic variable ratio tester | GD-700 | 1 |
02 | power analyzer | GD-300C | 1 |
03 | dual channel DC resistance tester | GD200-20A | 1 |
04 | insulation resistance tester | common 3125A | 1 |
05 | temperature inspector | 8 temperature passageway | 1 |
2、 High and low voltage control cabinet (containment structure, it can be hoisted as a whole, convenient and quick, internal wiring completed at once, saving installation and commissioning time). | |||
01 | instrument integration unit one set |
| 1 |
02 | PLC control device | SIEMENS S7-200 | 1 |
03 | test project distribution device | 300A | 1 |
04 | high voltage current metering device |
| 1 |
| High voltage precision current Mutual inductor | 200-100-50-20-10-5A/5A Voltage level:22/√3KV Precision grade:0.1grade | 3 |
05 | high voltage voltage metering devices |
| 1 |
| High voltage precision voltage Mutual inductor | (22.0-11.0-6.6-3.6)/√3/0.1KV Voltage level:22/√3KV Precision grade:0.1grade | 3 |
4、 Equipment | |||
01 | three-phase induction voltage regulator | 200KVA(10-650V) | 1 |
02 | intermediate transformer | 200KVA | 1 |
03 | frequency doubling generator | 30KW/150HZ、800V | 1 |
5、Test transformer console | |||
01 | high voltage test transformer | 20KVA/100KV | 1 |
02 | test transformer console | 20KVA(including electric voltage regulator) | 1 |
03 | protection resistance | 100KV | 1 |
Accessories | Special high voltage discharge rod |
|
|
| High voltage test line |
|
|
| Grounding wire and plug |
|
|
6、 Other | |||
01 | cable and wire | Voltage regulator input:100mm23*10M Voltage regulator output:50mm23*10M Intermediate variable input:100mm23*10M Intermediate variable output: 50mm23*10M(high voltage line) Frequency doubling unit input:16mm23*10M Excitation regulation:10mm23*10M Frequency doubling unit output: 10mm23*10M Test transformer input:10mm22*10M Test line:35mm23*10M(high pressure line) | 1 |

III.Installation and commissioning
1. After the production of complete sets of equipment is completed, preliminary installation and commissioning work shall be carried out to reduce on-site installation and commissioning time. The on-site installation and commissioning shall require the necessary assistance from the purchaser, and the supplier shall provide training to the demand side in order to be able to operate the equipment proficiently. The contents include: system overview, basic working principle of the system, operation and usage of equipment, inspection and maintenance of equipment, failure analysis and processing.
2. After trial operation or normal operation, technical personnel of both parties will test the technical indicators of the equipment.
Precautions
1. The equipment demander only needs to provide three : power distribution cabinet with frequency 50Hz±0.1 and current not less than 500A;
2 The grounding resistance of the installation site shall not be greater than 0.5 ohms; in order to maintain the integrity of the site, it is better to pre-ditch the cable trench in the control room and equipment area during the civil construction;
3. Delivering the equipment should also provide detailed technical documents, instructions for use, electrical installation plans and related information;
4. The unfinished matters are negotiated and resolved by the two parties.











所有评论仅代表网友意见,与本站立场无关。