I.Products Introduction
HZ-8600 Phasing Unit,for MV overhead distribution circuit,used for detection of high-voltage power grid closing point on both sides of the phase sequence is the same. Two power line connection before must check phase sequence, or line may be short circuit. The instrument suitable for 36KV power transmission line, and can test whether line charged. The Instrument adopts the wireless transmission technology, safe and reliable operation, easy to use.
II.Working Principle
The instrument consists of two transmitters (x and y) and a receiver. Two emitters can be
judged whether line charged, and launch phase signal. Receiving meter receives two emitters’ signal, to judge whether the same on both sides phase sequence.
III.Security Matters
1. Insulating rod before using should be voltage withstand test.
2. The standard configuration insulating rod length is 3 m, corresponding voltage for ≤ 220 KV. If the measurement circuit voltage higher than 220KV, please use the length of more than 3 meters of the insulating rod.
3. Operation hand position not more than insulating rod handle position.
IV.Technical Characteristic
1. Accuracy:When phase sequence is same: the error≤ 5 °.
2. The frequency accuracy:±0.1HZ.
3. Measuring voltage range is 36KV .
4. The transmitter and the receiving host transmission distance is more than 130 meters, the maximum distance between the two transmitters is about 260 meters.
5. Results (in phase, interphase) using A standard, phase difference acuity ≥30 ° for out phase, the phase difference < 30="" °="" are="" in="" phase.="">
6. Screen shows two lines at the same time of phase difference, frequency, waveform and the vector diagram.
7. The host shows battery, half an hour without automatic shutdown operation.
8. Two emitter and receiver use rechargeable lithium battery.
9. Have high pressure test report and the function of the phase sequence.
The voltage level instructions:
| The voltage level instructions | Instructions | Added |
| 500KV | Launcher insulating rod (5 meters), the hook on the high tension line directly, host boot. | Conventional |
| 330KV | Launcher insulating rod (4 meters), the hook on the high tension line directly, host boot. |
Conventional |
| 220KV | Launcher insulating rod (3 m), direct hook on the high tension line, the host boot. |
Conventional |
| 110KV | Auncher insulating rod (3 m), direct hook on the high tension line, the host boot |
Conventional |
| 35KV | Launcher insulating rod (3 m), direct hook on the high tension line, the host boot. |
Conventional
|
| 10KV(bare wire) | Launcher insulating rod (3 m), direct hook on the high tension line, the host boot. | Conventional |
| 380V/220V | Use the special test line of mains connection launcher (as shown in figure 1), the host boot. | Use the special test line of mains |
| Switchgear induction electric (~ 5 V) | Use switchgear induction electric test line connection transmitter (see switchgear induction electric measuring point) host boot | Use switchgear induction electric test line. |